About The Institute
eligibity in futuronix
Technical Resources
Credentials
Study Material
Instrument
Registration
Feedback
• All full module trainees placed • More then 3000 trainees benefited in last year • Only Automation training Institute having ISTE membership • Experienced and erudite faculty • Training provision on multi brand automation products • Training at client’s facility • State-of-the-art lab and library • Relevant study material • Intensive skill development • Provision of excellent career opportunities
   
 

 

Micro

 

 

Touch Screen

 

 

A.R.D

 

 

AC-DRIVE

 

 

Scada

 

 

HMI

 

 

Pressure Switch

 
   

Instruments

Instrumentation is mother of Automation industry. Keeping this fact in view we specially included this as a part of curricular which is unparallel to other training centre. We have delineated 32 hours study to this segment and posses all the possible field instruments under our roof.

AC Drive

Ammeter

B-Phase

Compensation Wier Thermocouple

Compensation Wire RTD

Contactor

Contactor With O/L

Contactor With O/L And Auxilay block

CT

Emergency Stop

HMI

Incrementatl encoder

Limit Switch

MCB-OP

MCB-SP

MCB-TP

PLC Control Card

PLC Modicon

PLC Power Card

Power Supply

Pressure Switch

Pressure Transmitter

Proximity Switch

Push Button (Red)

Push Button(Green)

Relay block

R-Phase

RTD Pt -100 with Transmeter

RTD(PT-100)

Selector Switch

Signal Converter

Single Phase Preventer

Star Delta Timer

Temperature Switch

Terminal block

Terminal block fused

Thermo Couple

Timer

Voltmeter

Y-Phase